Conductor Pile Driving Operation
PROJECT: | 30’’ x 1’’ WELDON CONDUCTOR PILING& COLD CUTTING |
FACILITY: | NEW SHENGLI-1 |
WELL: | NAG-TKZX-8 |
DURATION: | 8 DAYS |
DATE: | 18/03/2019 – 25/03/2019 |
PROJECT OPERATION OVERVIEW
The 30’’ Conductor Pile driving, welding and cold cutting operation, was carried out on a Jack-up Rig for our client, the operation involved welding strings of conductor pipe together then piling with a DELMAG D30-32 Hammer until desired depth, then finally cold cutting and beveling, the operation was a success.
Why Should You Use Us
Bamor projects are carried out as professionally as possible, meeting all specified quality requirements, with the aim of ensuring customer satisfaction & zero complaint at the end of every project delivered.
- Expertise: We mobilized competent personnel and equipment for all field engineering operations.
- Efficiency: we deliver services to our customers in a timely, cost effective and safe manner.
- Competitive prices: Our services guarantee no hidden fee. We are able to offer prices that are transparent.